Riggins Construction & Management, Inc. was contracted as the Design-Builder to repurpose this tired warehouse / office space into a functioning, specialty bearing manufacturing plant.
The City street was excavated (and repaved) to install a 6”ø pipe that tapped into the existing 12”ø water main on the north side of Lawson River Avenue. This was done to add fire sprinklers to the building. Furthermore, an extension to the 6” detector check assembly for fire protection was installed.
We removed landscaping in the front of the building to make room for an ADA-compliant ramp. We then re-landscaped, repaved, striped, and installed signage for the two new handicap stalls at the east elevation. We also added a handrail to the front stairs and met path-of-travel requirements from the parking area to the front door.
All cracks in the concrete tilt-up panels were structurally repaired via epoxy injection method. The entire warehouse was painted and accented with a royal blue wainscot. The concrete floors were also repaired. Continue reading